×

Get In Touch

Contact Info

Phone number

92 321 8073738

Email address

info@pakgusu.com

Address info

8-Km, Sundar-Raiwand Road, Lahore, Pakistan

Pak Gusu is a Pakistan-based cleanroom manufacturer and technical partner of GUSU Purification (China) that exports modular cleanroom systems, wall and ceiling panels, doors, pass-through chambers, HEPA terminals and FFUs to clients across the GCC. We fabricate at our Lahore facility and source specialist components from GUSU China where the application calls for it, then consolidate, crate and ship complete project kits to your nearest Gulf port. Whether you are building a pharmaceutical fill-finish suite in Riyadh, a medical-device assembly line in Dubai, or a food-grade packing hall in Doha, we deliver hardware designed to meet ISO 14644 and EU-GMP Annex 1 requirements.

Our model is straightforward: you receive a single coordinated shipment under CIF or DAP Incoterms, with all panels, profiles, hardware and documentation labelled by zone and grade for fast site assembly. On-site installation and supervision are available across the GCC at extra cost, and we provide full validation support so your local team or appointed contractor can complete IQ/OQ/PQ and submit to the relevant regulator. We have no Gulf office and do not hold local licences, so we are transparent about which activities we perform from Pakistan and which require a nominated installer or consultant in-country.

How we manufacture and source for GCC projects

Every Gulf order starts with a design review against your target classification, so the right materials and airflow strategy are specified before fabrication. EU-GMP Grade A/B zones (≈ISO 5), Grade C (≈ISO 7) and Grade D (≈ISO 8) each drive different panel, coving and filtration choices, and we engineer the kit accordingly.

We fabricate sandwich panels, aluminium profiles, flush doors, view windows and pass-through chambers at our Lahore plant, and we source HEPA/ULPA filters, fan filter units and specialist components from GUSU Purification in China when an application requires them. Everything is bench-checked and pre-assembled where practical to cut on-site time.

  • Cleanroom envelope: wall and ceiling panels, coving, walkable and non-walkable ceiling systems
  • Access and transfer: hinged and sliding doors, interlocked pass-through chambers, view windows
  • Air handling hardware: HEPA terminal boxes, fan filter units, return-air components
  • Documentation: material datasheets, drawings and a validation-ready dossier per zone

Shipping to Jebel Ali, Dammam and Hamad

We ship complete project kits to the GCC's main entry ports and tailor the routing to your site. Sea freight is the default for full cleanroom packages; air freight can be arranged for urgent spares or small high-value items.

  • UAE: Jebel Ali Port (Dubai) for projects in Dubai, Sharjah and the Northern Emirates, with Abu Dhabi served onward by road
  • Saudi Arabia: King Abdul Aziz Port, Dammam for the Eastern Province, Riyadh and central KSA
  • Qatar: Hamad Port for Doha and surrounding industrial zones

We quote under CIF (we arrange carriage and insurance to your named port) or DAP (we deliver to a named place such as your site or warehouse, with you handling import duties and clearance). Indicative production lead time is typically 4-8 weeks depending on project size and component sourcing, plus ocean transit and local clearance. Each consignment is crated, palletised and labelled by zone and grade, with a packing list and drawings that let your team or installer unload and stage materials in the correct sequence.

On-site installation, supervision and validation support

Installation and supervision are optional and priced separately from the hardware. You can self-install using our drawings and labelled kit, appoint a local contractor, or request a Pak Gusu supervisor or installation team to mobilise to your GCC site.

Where we attend in person, our scope covers panel and ceiling assembly, door and pass-through fitting, sealing and coving, and commissioning checks alongside your mechanical and electrical trades. Visa, travel, accommodation and on-site duration drive the cost, which we confirm in writing before mobilisation.

For regulatory acceptance, we provide validation support rather than performing certification ourselves. We supply as-built drawings, material certificates and a structured dossier so your team can run IQ/OQ/PQ and demonstrate compliance with ISO 14644 and EU-GMP Annex 1. We support your submission to the applicable authority, whether that is Saudi SFDA, UAE MOHAP, DHA in Dubai, DoH in Abu Dhabi, or Qatar MoPH, and we coordinate with your nominated consultant on documentation queries.

Sectors and applications we equip across the Gulf

Our GCC shipments serve regulated and industrial environments where particle control and contamination management are mandatory. The same export-and-install model applies across each sector, with the classification and finishes adjusted to the use case.

  • Pharmaceutical and nutraceutical: aseptic processing, OSD lines and packing halls built to EU-GMP Annex 1 and WHO expectations
  • Medical and surgical devices: assembly and packaging suites aligned to ISO 13485 quality systems
  • Healthcare and hospitals: operating-theatre envelopes, CSSD and compounding areas
  • Food and beverage: hygienic processing and packing zones meeting GSO hygiene principles
  • Electronics and laboratories: ESD-aware enclosures and controlled R&D spaces to ISO 14644 ISO 5-8

Ready to start your GCC cleanroom project?

Get a free, no-obligation quote — export pricing, lead times and installation across the GCC.

Answers

Frequently Asked Questions

Common questions about cleanrooms, standards, cost and how Pak Gusu supplies and installs across the GCC.

Which GCC ports do you ship cleanrooms to?

We ship to the Gulf's main entry ports: Jebel Ali (UAE), King Abdul Aziz Port in Dammam (Saudi Arabia) and Hamad Port (Qatar). From there, consignments move by road to inland sites such as Riyadh or Abu Dhabi. We quote on CIF or DAP Incoterms and label each crate by zone and grade for staged unloading.

Do you install cleanrooms on-site in the GCC?

Yes, on-site installation and supervision are available across the GCC at extra cost. You can self-install from our labelled kit and drawings, use a local contractor, or have a Pak Gusu team mobilise. We confirm scope and costs, including visa, travel and duration, in writing before any mobilisation to your Gulf site.

What is the lead time for a cleanroom shipped to the Gulf?

Indicative production lead time is typically 4-8 weeks, depending on project size and whether components are sourced from GUSU in China. Ocean transit and local customs clearance are additional. We confirm a firm schedule after the design review and component selection, and consolidate everything into one coordinated shipment per project.

Are your cleanrooms compliant with GCC regulatory standards?

Our systems are designed to meet ISO 14644 and EU-GMP Annex 1, with EU-GMP Grade A/B≈ISO 5, C≈ISO 7 and D≈ISO 8. We provide validation-ready documentation and support your submission to authorities such as Saudi SFDA, UAE MOHAP/DHA/DoH or Qatar MoPH. We do not hold local licences ourselves; your team or consultant completes certification.

What is the difference between CIF and DAP for my order?

Under CIF we arrange carriage and insurance to your named GCC port, and you handle import clearance and onward transport. Under DAP we deliver to a named place such as your site or warehouse, with you responsible for import duties and customs. We recommend the term that best fits your in-country logistics and quote both on request.

Do you provide validation and IQ/OQ/PQ in the Gulf?

We provide validation support, not certification. You receive as-built drawings, material certificates and a structured dossier so your team or appointed consultant can execute IQ/OQ/PQ and demonstrate ISO 14644 and EU-GMP Annex 1 compliance. We answer documentation queries and support your regulatory submission, but the formal qualification is completed in-country.

Cleanrooms supplied & installed across the GCC

Manufactured in Pakistan with GUSU (China) technology · shipped to Jebel Ali, Dammam & Hamad (CIF/DAP) · installation available across the Gulf.

Get a Free Quote →