×

Get In Touch

Contact Info

Phone number

92 321 8073738

Email address

info@pakgusu.com

Address info

8-Km, Sundar-Raiwand Road, Lahore, Pakistan

Pak Gusu is a cleanroom manufacturer with its own factory in Lahore, so for Lahore-based pharma, nutraceutical, food, cosmetics and electronics makers it designs and builds ISO 14644 / EU-GMP cleanrooms locally — with shorter lead times and closer on-site support than imported or distant-supplier alternatives. Because the panels, doors and pass-through chambers are fabricated here on Sundar–Raiwind Road rather than shipped in, site surveys, design revisions, delivery and after-sales call-outs all happen close to your plant.

We are the technical partner of GUSU Purification (China), combining proven Chinese cleanroom engineering with a Pakistani manufacturing base. From the Sundar Industrial Estate and Quaid-e-Azam Industrial Estate (Kot Lakhpat) corridors to the Multan Road and Raiwind Road pharma cluster, we handle the full turnkey scope: layout and airflow design, modular wall and ceiling panels, HVAC and HEPA filtration, flooring, doors, pass boxes and the documentation pack your team needs for IQ/OQ/PQ.

This page explains the sectors and grades we serve in Lahore, why local manufacturing shortens your project, the standards your room must meet for a DRAP submission, and the practical things to check before you commission any cleanroom contractor.

Key takeaways

  • Pak Gusu's manufacturing facility is in Lahore (8-Km Sundar–Raiwind Road), so design, fabrication and support are local — not imported.
  • Turnkey scope covers ISO Class 5–8 and EU-GMP Grade A–D rooms: layout, modular panels, HVAC, HEPA H13/H14, flooring, doors and pass-throughs.
  • We serve Lahore's pharma cluster (Multan Road / Raiwind Road), Sundar Industrial Estate and Kot Lakhpat across pharma, nutraceutical, food, cosmetics and electronics.
  • Rooms are engineered to support your DRAP / EU-GMP submission and are validation-ready for IQ/OQ/PQ — we do not claim certification on your behalf.
  • Local fabrication shortens lead times and makes site surveys, design revisions and after-sales call-outs faster to arrange.
  • Cost is driven by ISO class, area, ACPH, finishes, HVAC and validation scope — model it on our cleanroom cost calculator.

Why does a Lahore factory matter for your cleanroom?

A cleanroom is not an off-the-shelf product — it is a building system that must be surveyed, designed, fabricated, delivered, installed and validated against your specific process. When the manufacturer's plant is in another country or another city, every one of those steps carries shipping time, customs, communication lag and travel cost. Because Pak Gusu fabricates its modular wall and ceiling panels, doors and pass-through chambers at its own facility on Sundar–Raiwind Road, Lahore projects benefit in concrete ways:

  • Faster site surveys — our engineers can reach Sundar Industrial Estate, Kot Lakhpat or the Raiwind Road cluster locally rather than flying in.
  • Shorter lead times — panels are cut and built here, so you are not waiting on a sea container and port clearance for the building envelope.
  • Easier design revisions — a layout or pressure-cascade change is handled at the local factory, not re-quoted across borders.
  • Practical after-sales — door alignment, gasket replacement, FFU servicing or an extra pass box is a call-out, not an import.

Installation supervision is available at additional cost, and the same local team supports your validation paperwork.

Which Lahore sectors and cleanroom grades do you serve?

Lahore and the wider Punjab industrial belt host a dense mix of regulated manufacturing. We design and build to the grade each process genuinely needs — over-specifying an ISO class wastes capital and energy, while under-specifying fails validation. Typical sectors and the grades they tend to require:

Sector (Lahore area)Typical productCommon class / gradeKey design driver
Pharmaceutical — Multan Rd / Raiwind Rd clusterOral solids, liquids, sterile fillISO 7–8 / Grade C–D; aseptic core to Grade A in Grade BPressure cascade, EU-GMP Annex 1
Nutraceutical — Sundar / Kot LakhpatSupplements, herbal, softgelsISO 8 / Grade DCross-contamination, dust control
Food & beverageDairy, bakery, packing, ready-to-eatISO 8 or controlled environmentHygienic finishes, washdown
Cosmetics & personal careCreams, lotions, fill-finishISO 7–8 / Grade C–DParticle & microbial control
Electronics & assemblyPCB, optics, devicesISO 5–7Particle count and ESD control; tight cleanliness tolerance

For the full process-by-process breakdown, see our pharmaceutical & nutraceutical and food & beverage industry pages, or browse all industries we support.

What does the turnkey scope include?

Turnkey means a single accountable supplier from concept to a validation-ready handover, so your team is not coordinating five trades. A typical Lahore project includes:

  • Design — room layout, personnel and material flow, pressure cascade, ACPH and HVAC load calculations to ISO 14644 and EU-GMP Annex 1.
  • Envelope — modular sandwich-panel walls and ceilings, coved corners, vision panels, flush doors and interlocked pass boxes.
  • Air system — air handling, terminal fan filter units with HEPA H13/H14 (EN 1822), and laminar flow units or an air shower where the process demands it.
  • Finishes — epoxy or PU flooring, sealed services, and lighting integrated into the ceiling grid.
  • Documentation — design records and protocols engineered to support your IQ/OQ/PQ and your DRAP / EU-GMP submission.

See the complete services list and the equipment range on our products page.

What drives the cost of a Lahore cleanroom?

We do not publish prices here because a cleanroom is bespoke — the same floor area can vary widely depending on its specification. The honest cost drivers to understand before you budget are:

  • ISO class / GMP grade — a Grade A/B aseptic core needs far more air changes (ACPH), filtration and validation than a Grade D room.
  • Area and height — total volume sets HVAC and filter capacity.
  • ACPH and pressure regime — tighter cleanliness means more air movement and energy.
  • Finishes — panel type, flooring, and the number of doors, windows and pass boxes.
  • HVAC and HEPA — the air handling plant is often the single largest line item.
  • Validation scope — how much IQ/OQ/PQ documentation and testing you require.

To model your own figures by ISO class, area and scope, use the cleanroom cost calculator — it is the only place on this site that computes indicative numbers. When you are ready for a firm proposal, request a quote and we will survey your Lahore site.

What to check before choosing a Lahore cleanroom contractor

Cleanroom buyers in Punjab tell us the same concerns come up repeatedly. Use this checklist to compare any supplier honestly, including us:

  • Do they design to the right class? Ask them to justify the ISO class and ACPH against your process, not just quote the cleanest room.
  • Is the filtration genuine? Insist on HEPA filters classified to EN 1822 (H13/H14) with test certificates, not unbranded panels.
  • Who owns the manufacturing? A local factory (as ours is in Lahore) means faster fixes and spares; a pure reseller depends on imports.
  • Is it validation-ready? The handover should support your IQ/OQ/PQ. Be wary of anyone who claims your room is already "GMP certified" — certification follows a regulator's audit of your operation, not the builder's say-so.
  • Is installation included? Clarify scope. Our installation supervision is available at additional cost — get this stated in writing.
  • Spares and after-sales — confirm lead time for replacement gaskets, doors and FFUs. Local fabrication makes this straightforward.

If a term is unfamiliar, our cleanroom glossary explains the engineering vocabulary in plain English.

Standards and regulatory context in Pakistan

Getting the standards right is the difference between a room that passes and one that fails an audit. The framework that applies to a Lahore cleanroom:

  • ISO 14644 — the international standard for airborne particle cleanliness classification (ISO Class 5–8 for most applications). See our explainer on ISO 14644 cleanroom classes.
  • EU-GMP Annex 1 — governs sterile and aseptic manufacturing, mapping to Grades A–D and driving the pressure cascade and contamination-control monitoring expectations.
  • DRAP — the Drug Regulatory Authority of Pakistan is the regulator for pharmaceutical manufacturing; your facility licence and GMP inspection are assessed by DRAP, and we design the room to support that submission.
  • PIC/S — Pakistan is a PIC/S applicant, so aligning with PIC/S GMP expectations is increasingly important for exporters; we engineer to that intent.
  • HEPA & HVAC — HEPA H13/H14 to EN 1822, with ACPH and pressure differentials documented for validation.

Pak Gusu builds rooms designed to meet these standards and engineered to support your submission and validation — we do not, and cannot, certify your facility on the regulator's behalf. For the validation sequence itself, read our guide on cleanroom validation (IQ/OQ/PQ).

Related pages

Ready to start your GCC cleanroom project?

Get a free, no-obligation quote — export pricing, lead times and installation across the GCC.

Answers

Frequently Asked Questions

Common questions about cleanrooms, standards, cost and how Pak Gusu supplies and installs across the GCC.

Where is Pak Gusu's cleanroom factory in Lahore?

Our manufacturing facility is on the 8-Km Sundar–Raiwind Road in Lahore, within reach of the Sundar Industrial Estate corridor. Because fabrication of panels, doors and pass-through chambers happens there, Lahore projects get local site surveys, shorter lead times and faster after-sales support than imported alternatives.

Do you build cleanrooms for pharma companies on Multan Road and Raiwind Road?

Yes. The Multan Road and Raiwind Road corridors host much of Lahore's pharmaceutical and nutraceutical manufacturing, and we design and build there regularly. Depending on the process, that ranges from ISO 8 / Grade D rooms for oral solids up to Grade A aseptic cores within a Grade B background, all engineered to support your DRAP submission.

Can Pak Gusu get my Lahore cleanroom GMP or DRAP certified?

No supplier can certify your facility — GMP licensing and DRAP approval are granted by the regulator after inspecting your operation. What we do is design and build a validation-ready room engineered to meet EU-GMP Annex 1 and ISO 14644, and provide the documentation to support your IQ/OQ/PQ and your DRAP submission.

What ISO classes and GMP grades do you cover?

We routinely deliver ISO Class 5–8 and EU-GMP Grade A–D environments. Electronics and optics work often needs ISO 5–7; most pharma, nutraceutical, food and cosmetics applications fall in ISO 7–8 / Grade C–D, with aseptic processes requiring a Grade A core inside a Grade B background.

How much will a cleanroom in Lahore cost?

Cost depends on ISO class, floor area, air changes per hour, finishes, HVAC and HEPA capacity, and validation scope rather than a single rate. To get indicative figures for your own parameters, use our cleanroom cost calculator, then request a quote for a firm, site-surveyed proposal.

Is installation included, or only the manufacturing?

We are primarily a cleanroom manufacturer; installation supervision is available at additional cost and should be confirmed in writing within your project scope. Because the factory is in Lahore, mobilising for installation, design changes and after-sales call-outs across Punjab is straightforward.

Cleanrooms supplied & installed across the GCC

Manufactured in Pakistan with GUSU (China) technology · shipped to Jebel Ali, Dammam & Hamad (CIF/DAP) · installation available across the Gulf.

Get a Free Quote →